Deck progress

So the actual building has begun!  After 2 trips to get the permit, weeks of necessary prep, removing almost all of the existing deck, Matt digging 18 (I think) footer holes, and 2 inspections of those holes, we had our first lumber delivery. (note: although the lumber was so expensive you'd think the 2 cute girls came with the lumber, they weren't included in the price)


A not very good picture of our deck "Before"


Partially Demolished:


And the building begins: