So the actual building has begun! After 2 trips to get the permit, weeks of necessary prep, removing almost all of the existing deck, Matt digging 18 (I think) footer holes, and 2 inspections of those holes, we had our first lumber delivery. (note: although the lumber was so expensive you'd think the 2 cute girls came with the lumber, they weren't included in the price)

A not very good picture of our deck "Before"
Partially Demolished:
And the building begins:
No comments:
Post a Comment